Lure Head 3D

J7W1 Shinden Restoration 3D Design Tips

Elaboration

Posted by kikakuya on December 23, 2007

The cover of main gear was corrected. The whole was made thin and one more sheet was put on the back. It has dual structure from the photograph of the system. It seems that in addition, something is between the cover and the main axis although it is not discriminable in wiring or a pipe in fact. Since an axis and the junction of a cover are also indistinct, this omits. Since the antenna has not attached at the time of the restoration around 1946, it was omitted now. The fabrication which remains are as follows about. Installation of elaboration of the storing space of main gear to the wing undersurface, the storing space of a nose gear, the cowling of the circumference of an inspiratory port, the inspiratory port behind a canopy and 30mm machine gun 4 gate of front nose etc. The fabrication in this year is end. The above new fabrication will be first work early next year. Anyhow, Merry Christmas and A Happy New Year!


j7w_1.gifj7w_2.gif

shinden1221_2.gif

Japanese is here.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: