Lure Head 3D

J7W1 Shinden Restoration 3D Design Tips

Elaboration

Posted by kikakuya on December 23, 2007

The cover of main gear was corrected. The whole was made thin and one more sheet was put on the back. It has dual structure from the photograph of the system. It seems that in addition, something is between the cover and the main axis although it is not discriminable in wiring or a pipe in fact. Since an axis and the junction of a cover are also indistinct, this omits. Since the antenna has not attached at the time of the restoration around 1946, it was omitted now. The fabrication which remains are as follows about. Installation of elaboration of the storing space of main gear to the wing undersurface, the storing space of a nose gear, the cowling of the circumference of an inspiratory port, the inspiratory port behind a canopy and 30mm machine gun 4 gate of front nose etc. The fabrication in this year is end. The above new fabrication will be first work early next year. Anyhow, Merry Christmas and A Happy New Year!


j7w_1.gifj7w_2.gif

shinden1221_2.gif

Japanese is here.

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <pre> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>